OWADMS-01 automatically measures optical angular deviation, binocular deviation, and optical wedge angle. The measurement range is 70 arcmin or 4200 arcsec. A windshield manufacturer preparing an RFQ should first specify which of these quantities is needed, where it must be measured and how the result will support a quality or engineering decision.
The system measures optical wedge angle in the HUD area of automotive windshield glass. A visible double image can have more than one contributing factor, so a wedge-angle measurement should be planned as evidence for the investigation rather than treated as a complete diagnosis.
Define the measurement and system boundary
The system performs line-scan measurements across multiple designated sample areas and points in one run. Line-scan results can be fitted with straight lines, and measurement results can be archived and loaded. The system consists of a laser light-source sensor system, an electronically controlled sample support, an industrial PC, and software. The buyer supplies representative windshields, the area and point plan, and the acceptance basis.
| OWADMS-01 detail | RFQ question |
|---|---|
| Measurands | Which of angular deviation, binocular deviation and wedge angle are required? |
| Measurement range | Is 70 arcmin or 4200 arcsec suitable for the expected values? |
| Resolution | 0.04 arcmin, 2 arcsec, or 0.01 mrad |
| Power | The power supply is 220 VAC. |
| Operating environment | 15–35 °C and relative humidity below 85% |
Configuration reference: OWADMS-01, Jeffoptics product page captured July 2026. Verify the proposed configuration, sample and site requirements in the quotation.

Describe the samples and measurement areas
Provide drawings or representative samples for each windshield model, including dimensions, curvature, laminate construction, coatings, installation angle and accessible support surfaces. Mark the HUD area and each line or point the team wants to compare. State whether the objective is development, incoming inspection, laboratory evaluation or a production-related station.
Keep wedge angle, optical angular deviation and secondary-image separation distinct. A test plan should specify the quantity and viewing or installation conditions needed for each decision. If the available system does not cover a required measurement, ask Jeffoptics to evaluate an alternative or tailored project rather than treating the quantities as interchangeable.

Make the workflow and data requirements quotable
Explain the expected models per shift, sample loading method, requested cycle target, scan locations and changeover needs. The listed multi-area line scan is a useful starting point for discussing point coverage; actual cycle time depends on the proposed configuration and test plan.
Give an example of the desired output, record identifiers, review and retention process. The system can archive and load results; request a demonstration of any specific export, network or quality-system interface rather than assuming it is standard. Include the available floor space, power, environment and responsibility for sample handling.
Agree on acceptance before purchase
Share the governing customer specification or internal test method, target range, reference samples, measurement uncertainty needs and the comparison method for acceptance. Identify who approves the point plan and owns final pass/fail decisions. These inputs help a supplier scope an instrument and any requested changes without making a premature performance promise.
Request an optical-system quotation
Send sample drawings, model count, installation angle, target optical quantities, point map, desired cycle, support constraints and reporting requirements. Add destination, schedule, training, budget and whether a standard, modified or custom solution is acceptable.
Review OWADMS-01 or contact Jeffoptics.
Frequently asked questions
Does wedge angle alone explain every HUD ghosting problem?
No. Define the symptom and the optical quantity to investigate; other causes and measurements may need review.
Is a specific database connection included?
The system can archive and load results. Submit any database or network connection as a requirement for review.
Post time: Nov-20-2026